Guangdong Shunde Langzhi Trading CO., Ltd

Home> Blog> The installation step and precaustions of Bathroom exhaust fan

The installation step and precaustions of Bathroom exhaust fan

April 01, 2022

 The partition decoration is one of the most important considerations When the bathroom is being renovated. The sanitary partition can effectively use the space, and the chic and ingenious partition can also improve the appearance. So how do you choose the materials for the sanitary partition installation? What are the steps for the sanitary partition installation? Let's take a look at the following.

20220221083748 Png

Toilet partition material selection

Which materials should be used for sanitary partition decoration, the design of the bathroom is basically convenient, safe, easy to clean and beautiful. Since there is often water vapor in the room, the interior decoration materials must be mainly waterproof and moisture-proof materials.

1. Sanitary partition floor material: The ground should be waterproof, stain-resistant, non-slip granite, etc., the height should be lower than other ground 10--20mm, the floor drain should be lower than 10mm left glaze winter to facilitate drainage.

2, sanitary partition wall material: the bathroom wall area is the largest, must choose strong waterproof, and has anti-corrosion and anti-mildew materials. Easy to clean tiles, marble, mosaics, etc., can be collaged with rich patterns, and smooth and easy to dry, is a very practical wall material, but pay attention to the color of the ground material.

3. Sanitary partition top material: The top surface is affected by water vapor, and it is most prone to mildew. It is better to use waterproof and heat-resistant materials. Generally, it is made of colorful molded aluminum gusset and acrylic molding ceiling. These materials are strong in water resistance and have thermal insulation on the surface. They are ideal for bathroom ceilings. The specifications are mainly 120mm wide strip and 300mm*300mm square. The structure has two kinds of flat and micro air. Acrylic molded ceilings are cheaper but easier to age; the colorful molded aluminum gussets are more expensive, but the colors are diverse and durable, making them the main materials used in modern bathroom ceilings. In addition, there is also an aluminum-plastic plate or a calcium silicate board, the latter of which is coated with cement paint, which is low in price and highly waterproof.

Hygienic partition installation steps

Step 1: Install the fixing plate

Find the appropriate position on the wall and draw the center line of the fixing piece. Look at the fixing plate with several fixing screw holes, then put a few holes on the center line of the wall and put the plastic racing sleeve into the hole. The next step is to fix the fixing plate to the wall with an expansion wire.

Step 2: Install the adjustment base

According to the pre-designed construction drawing, find the base position on the floor of the bathroom floor and draw the center line, then fix the base (the base position is about 20 cm away from the edge of the partition plate)

Step 3: Install the compartment board

The first two steps of the work are to lay the mat for the installation of the partition board. The function of the fixed board and the base is to fix the partition board, put the partition board on the adjustment base, and then adjust the height of the base so that the partition board fits snugly. Fix the board on the wall, then fine-tune the height of the base so that the partition board is at a certain distance from the ground, about 15 cm, then use the level to determine the level. After everything is adjusted, fix the partition plate with screws. Plate and adjustment base.

Step 4: Install the lever

Cut and fix according to the actual length of the compartment. When the straight rod is flat, the circular phase joint sleeve and the tight spring piece shall be installed in the tube to ensure that the joint is flat and firm, and the joint should be in the upper fixed piece to increase Beautiful. For the 90 degree corner tie rod of the compartment, the 90 degree angle joint of the aluminum alloy injection molding is used to connect the rods at both ends of the corner. Fix the sleeve with a convex round wall and fix the terminal lever to the wall with screws. Use a screw to attach the tie rod to the upper edge of the column.

Step 5: Install the column

Fix the tie rod fixing piece with screws, fix it on the middle top of the column, fix the piece with L-shape, and fix the column and the partition plate together with the wall side column-- draw a straight line perpendicular to the ground on the wall surface, and drill it online. 3 External drilling, pre-embedded plastic plug in the hole, after determining that it is perpendicular to the ground, fix the piece with the L-shaped piece with screws to fix the wall-side column to the wall above the ground 145. Terminal column--fixing the upper edge tie rod fixing piece and the L-shaped side piece on the terminal column, and then fixing the plate to the partition plate with screws

Step 6: Install the door leaf

Fix the hinge seat or page nose on the column, measure two or three, then install the corresponding number of hinge pieces at the corresponding position on the door leaf, lift the door leaf, place the automatic homing nylon seat in the hinge seat, adjust the position, and When the switch door is checked, the switch can be opened and closed freely, and the adjustment is checked until it is satisfied.

The above contents are the material selection and steps for the sanitary partition installation. I hope everyone can help you after understanding. If you would like to know more about the sanitary partition installation, you can log in to the Groundhog Network for a detailed understanding.


Edited by Langzhi factory

Contact Us

Author:

Ms. Shuzhen Ou

Phone/WhatsApp:

+8613928280950

Popular Products
You may also like
Related Information
How to connect and plan the switch socket

In our home decoreation , The switch and socket are the building materials could not be separated. It brings convenience to our daily electricity use. Many owners will complain about the lack of...

The layout and precaustions of Home-installed switch socket

switch sockets are the important in home renovations , but the wires are mainly buried in the walls. Therefore, some people do not pay much attention to the selection of wires. Let's take a look at...

The specifications of Home exhaust fan and the brand

We all noted that for the exhaust fan, we could not unfamiliar with it. We can see it in the bathroom or in the kitchen at home. It not only effectively prevents static electricity, it is difficult...

how to installation the electric double eccentric btterfrl valve?

We need to know the Electric double eccentric butterfly valve cut off and throttling effect in the pipeline, electric double eccentric butterfly valve opening and closing pieces is a disc-shaped...

Related Categories

Email to this supplier

Subject:
Email:
Message:

Your message must be betwwen 20-8000 characters

Contact Us

Author:

Ms. Shuzhen Ou

Phone/WhatsApp:

+8613928280950

Popular Products

Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send